Project Description
Project Description
Clinical Research Facility/Translational Research Facility MV/LV Enabling Works
The CRF-
The building is arranged as a predominantly horizontal facility with accommodation spread over four floors, along with a roof-
The Translational Research Facility (TRF) is accommodated on the second and third floors, with internal planning providing for open and flexible lab spaces, with dispersed core lab functions and highly flexible lab casework systems. The development includes all ancillary site and landscaping works.
Project Details
Electrical scope of work: Extension of the MV Ring, Supply and installation of ABB Unigear primary rated MV Switch, ABB Resibloc 1600kVA 20kV/400V Transformer, Main Low Voltage Switchboard, Associated protection system, extension of “GOOSE” system and determination of protection settings, Cable containment system, Fire Alarm and Fibre Links.
Services Engineer: Homan O’Brien
Main Contractor & PSCS: BAM Building
Duration: 12 Months
Value: €650,000