NUIG/University Hospital Galway

nui_galwayClinical Research Facility/Translational Research Facility
MV/LV Enabling Works
Work has started on the Enabling Works Package. Electrical scope includes:

  • Extension of the MV Ring
  • Supply and installation of ABB Unigear primary rated MV Switch
  • ABB Resibloc 1600kVA 20kV/400V Transformer
  • Main Low Voltage Switchboard
  • Associated protection system, extension of “GOOSE” system and determination of protection settings
  • Cable containment system

 

2021-02-12T12:32:44+00:00 November 12th, 2013|