Project Description
Project Description
€6M facility consisting of three outdoor pitches, a three-quarter length indoor pitch, changing rooms, medical rooms and state-of-the-art strength and conditioning facilities on campus.
The new facility will play an important part in the continued development of the sevens squads, with the men having recently qualified for the World Sevens Series circuit for next season, while both are bidding to reach the Tokyo 2020 Olympics.
Project Details
Electrical scope of work:
Design & Build LED sports lighting solution;
- Elite Pitch – 500 lux Ev, 0.7 min Ave
- Pitch 1 & 2 – 500 lux Eh, 0.7 min Ave
Load balanced and synchronised power distribution, dimming, touch screen remote control over TCP/IP (Internet)
Design Engineers: McSherry Electrical, Musco Lighting, Tobin Consulting Engineers, Don O’Malley & Partners
Main Contractor & PSCS: CRL
Duration: 6 Months